Feb
20

Mustang Project Update

Posted by Comments Off on Mustang Project Update

Mustang Metalwork Moving Along

The boys in the Ghostworks Garage shop have been hard at work sculpting some new sheetmetal for the ’69 Mustang project. Mark McDonald has formed a new front valance that functions as an air dam along with channeling cool air to the blower intercooler and the brakes. The front bumper has also been tucked for a cleaner appearance.

Out back, the rear bumper has been tucked and reshaped. The lower rear valance has been reworked to include provisions for through-the-valance exhaust. The center of the panel now incorporates an integral diffusor.

Shortly after these photos were taken, the Mustang was trucked over to the paint shop where final prep and body straightening will take place. Stay tuned for more updates as progress on the Mustang continues!

Categories: What's New

Comments are closed.

Subscribe to our mailing list

* indicates required